DTMACH curve edge banding machine features:
1. Machine arm length 1.8 m, can edge band 2.4X1.2m panel
2. Double pedal control, one controls the suction cup and the other controls the edge band strip feeding
3. Equipped with 30cm suction cups to suck the panel firmly
4. Two breaking edge band strip ways, time breaking and foot breaking
5. Glue pot capacity 1200ml, no need to add glue frequently 6. Gluing adopts double spiral gluing, sufficient glue, grid-shaped glue roller, uniform glue coating, firm adhesion, double-sided glue coating can be selected for straight edge banding
7. New pressure strip plate ensures uniform glue coating and continuous glue
8. Double cylinder design, feed cylinder and cutter cylinder are separated, making the transmission more stable and strip breaking faster.
9. New strip board prevents edge banding from rebounding
10. 2 limit positions to prevent edge banding from running off
11. Infinitely variable speed, adjustable speed
12. Add auxiliary pressure wheel to make the paste more firm
13. Automatically spray clear glue to prevent glue sticking, Add hot air function, heating after glue application to increase the firmness of the paste
Voltage |
220V/50HZ/1phase |
Total power |
3.4KW |
Air pressure |
0.5-0.8Mpa |
Heat power |
1.2kw |
Edge band thickness |
0.4-2mm |
Edge band width |
8-50mm |
Edge banding speed |
0-18cm/s |
Motor power |
0.18kw |
Package size |
1960*1700*1250mm |
Weight |
157kg |
Detailed Photos
Product Display
Company Profile
Certifications
Packaging & Shipping
FAQ
Q1: I want a edge banding machine , can you give me some suggestions ?
A : Sure, we will give recommend of the most suitable machine. Before that, we need to know some information, such as board thickness, strips material, local voltage etc .
Q2: Which kind of materials can be processed on this machine?
A : PVC, melamine, plastic and other materials.
Q3: Are you a factory or trading company ?
A: We are the manufacturer for 20 years. You can fully trust the machines we produce . Most importantly, we will provide you with the most thoughtful and best after - sales service.
Q4: How should I pay for my order?
A: Pay 50% as prepayment as first, then we will start to make production. When the machine is completed, we will send pictures or videos to you, and then you need to pay the balance. We will ship the machine to you after we receive your full payment .
Q5: How long is the delivery time ?
A : For standard machines, it will be 12-15 days . For customization, it will be 15-30 days .